Client: E.ON, Zilinskis & CO AB
Year: 2024–2025
Location: Sollefteå, Sweden
LEC, in collaboration with partner Zilinskis & CO AB, carried out the construction of a 130 kV high-voltage overhead transmission line for E.ON in the Sollefteå region. LEC was responsible for the installation of insulators, pulling and securing overhead conductors, optical ground wire (OPGW), and lightning protection conductors. The total length of the line was 26.46 km, including 13.40 km of double-circuit line, ensuring reliable and secure power transmission.