Client: E.ON, Zilinskis & CO AB

Year: 2024

Location: Sundsvall, Sweden

LEC and its partner Zilinskis & CO AB constructed a 130 kV overhead transmission line for E.ON in the Sundsvall region. The scope included installation of insulators and the pulling and securing of overhead conductors, OPGW, and lightning protection wires. The total line length was 7.3 km. Key challenges involved crossing Sweden’s main highway E4 and an electrified railway line, which were successfully managed through careful planning and close coordination.