Client: Svenska Kraftnät, Siemens Energy AB
Year: 2022–2024
Location: Timmersdala, Sweden
LEC participated in the construction of the 400 kV FT52 Timmersdala substation, working alongside Siemens Energy AB as a subcontractor for electrical installation works. LEC installed both primary and secondary equipment, laid power and communication cables, assembled metal structures, and completed electrical installations within the substation control building, including control and relay protection systems. Additionally, a 1.2 km section of the adjacent 400 kV overhead transmission line was reconstructed, including replacement of metal towers, insulators, conductors, and OPGW cables.