Client: Enercon GmbH

Year: 2019 – 2021

Location: Piteå, Sweden

In cooperation with turbine manufacturer and general contractor Enercon GmbH, LEC participated in the construction of the Dublabergen and Lillberget wind farms in northern Sweden, within the Piteå region. LEC was responsible for installing medium-voltage power cables and communication infrastructure. A total of 65.6 km of 33 kV power cables were installed, enabling efficient and reliable grid connection of the wind farms.

 